5 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Equity ETFs Composition is 20% | 12 Months Subscription Plan

8,000.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_5_320000_e_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 5 Equity and ETF Scripts {4 Equities and 1 Equity ETF}
ETFs Composition Percentage Equity ETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 65%
Minimum Annual Investment Capital ₹ 3,20,000
Optimal Investment Tenure 13 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.4
Backtest – Annualised Returns Hist. Annualised Returns Under 60%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 35%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 159 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 159.21 25.22 4.50 1.04 0.66 0.54
99% Probability 509.15 69.78 10.46 1.88 1.05 0.71
98% Probability 777.77 100.76 14.13 2.32 1.24 0.78
95% Probability 1,474.12 175.55 22.28 3.20 1.59 0.90
90% Probability 2,643.19 290.24 33.46 4.25 1.98 1.03
80% Probability 5,545.74 546.82 55.71 6.06 2.60 1.20
75% Probability 7,479.94 705.79 68.33 6.97 2.89 1.27
50% Probability 56,383.57 3,647.61 237.32 15.41 5.16 1.73

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare