5 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Equity ETFs Composition is 40% | 12 Months Subscription Plan

6,875.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_5_275000_e_40

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 5 Equity and ETF Scripts {3 Equities and 2 Equity ETFs}
ETFs Composition Percentage Equity ETFs Composition is 40%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 2,75,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 55%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 40%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 9 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 131 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 131.41 22.60 4.26 1.02 0.65 0.54
99% Probability 431.73 62.15 9.73 1.82 1.03 0.71
98% Probability 659.70 89.46 13.11 2.25 1.22 0.78
95% Probability 1,249.40 155.09 20.52 3.08 1.55 0.90
90% Probability 2,225.42 254.82 30.71 4.08 1.93 1.02
80% Probability 4,608.13 476.35 50.84 5.80 2.53 1.19
75% Probability 6,188.63 612.87 62.23 6.66 2.82 1.26
50% Probability 44,965.94 3,085.73 212.29 14.57 4.99 1.71

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare