5 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Equity ETFs Composition is 30% | 12 Months Subscription Plan

68,750.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_5_2750000_e_30

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 5 Equity and ETF Scripts {4 Equities and 1 Equity ETF}
ETFs Composition Percentage Equity ETFs Composition is 30%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 27,50,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.4
Backtest – Annualised Returns Hist. Annualised Returns Under 55%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 35%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 144 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 144.01 24.81 4.54 1.06 0.69 0.55
99% Probability 440.59 64.68 10.05 1.87 1.07 0.72
98% Probability 662.57 91.40 13.39 2.30 1.25 0.79
95% Probability 1,217.54 154.24 20.63 3.11 1.58 0.91
90% Probability 2,116.50 248.30 30.36 4.08 1.95 1.03
80% Probability 4,267.91 453.35 49.42 5.73 2.53 1.19
75% Probability 5,675.05 577.01 60.08 6.56 2.80 1.26
50% Probability 37,294.15 2,694.33 193.11 13.92 4.85 1.69

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare