5 Equity and ETF Scripts Long Term Growth Portfolio | Mixed Sectors 11 – Electrical Equipment – NBFCs – Industrial Manufacturing – Iron & Steel Products – Metals & Mining | Rebalancing Monthly | Equity ETFs Composition is 30% | 12 Months Subscription Plan

33,750.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /ms11_5_1350000_e_30

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Mixed Sectors 11 – Electrical Equipment – NBFCs – Industrial Manufacturing – Iron & Steel Products – Metals & Mining
Portfolio Size 5 Equity and ETF Scripts {4 Equities and 1 Equity ETF}
ETFs Composition Percentage Equity ETFs Composition is 30%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 13,50,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.1
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 35%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 35%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 11 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 28 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 28.38 6.96 1.90 0.66 0.50 0.48
99% Probability 94.91 19.71 4.47 1.21 0.81 0.64
98% Probability 146.73 28.67 6.08 1.51 0.95 0.71
95% Probability 282.91 50.48 9.64 2.08 1.23 0.82
90% Probability 511.44 84.16 14.57 2.79 1.53 0.94
80% Probability 1,081.18 160.22 24.51 4.00 2.02 1.10
75% Probability 1,464.55 207.64 30.17 4.61 2.25 1.17
50% Probability 11,524.34 1,112.16 107.24 10.34 4.06 1.59

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare