3 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 40% | 12 Months Subscription Plan

42,000.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_3_1680000_c_40

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 3 Equity and ETF Scripts {2 Equities and 1 Commodity ETF}
ETFs Composition Percentage Commodity ETFs Composition is 40%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 16,80,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 65%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 40%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 45%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 9 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 181 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 181.98 25.27 4.11 0.87 0.55 0.46
99% Probability 727.50 85.04 10.98 1.75 0.95 0.64
98% Probability 1,198.25 130.87 15.64 2.24 1.15 0.72
95% Probability 2,553.68 250.99 26.69 3.26 1.54 0.85
90% Probability 5,076.61 454.07 43.16 4.57 2.00 0.99
80% Probability 12,178.47 962.38 78.96 6.96 2.76 1.20
75% Probability 17,379.79 1,303.51 100.68 8.23 3.14 1.29
50% Probability 2,19,752.04 10,157.04 469.13 21.65 6.33 1.85

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare