25 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 40% | 12 Months Subscription Plan

42,375.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_25_1695000_c_40

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 25 Equity and ETF Scripts {20 Equities and 5 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 40%
Portfolio Risk Future Risk may Exceed 40%
Minimum Annual Investment Capital ₹ 16,95,000
Optimal Investment Tenure 8 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.1
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 30.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 30.88 7.66 2.21 0.76 0.57 0.54
99% Probability 90.23 19.72 4.72 1.32 0.88 0.69
98% Probability 132.78 27.64 6.21 1.60 1.02 0.75
95% Probability 238.87 45.84 9.37 2.14 1.27 0.86
90% Probability 405.63 72.35 13.57 2.78 1.56 0.96
80% Probability 790.81 128.36 21.54 3.83 2.00 1.11
75% Probability 1,035.47 161.67 25.91 4.35 2.20 1.17
50% Probability 6,105.51 689.74 78.06 8.84 3.70 1.55

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare