25 Equity and ETF Scripts Long Term Growth Portfolio | Mixed Sectors 11 – Electrical Equipment – NBFCs – Industrial Manufacturing – Iron & Steel Products – Metals & Mining | Rebalancing Monthly | Equity ETFs Composition is 20% | 12 Months Subscription Plan

46,000.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /ms11_25_1840000_e_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Mixed Sectors 11 – Electrical Equipment – NBFCs – Industrial Manufacturing – Iron & Steel Products – Metals & Mining
Portfolio Size 25 Equity and ETF Scripts {20 Equities and 5 Equity ETFs}
ETFs Composition Percentage Equity ETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 50%
Minimum Annual Investment Capital ₹ 18,40,000
Optimal Investment Tenure 10 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 53 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 53.88 12.66 3.35 1.05 0.73 0.62
99% Probability 132.49 27.99 6.35 1.65 1.05 0.77
98% Probability 183.96 37.15 8.00 1.95 1.19 0.83
95% Probability 302.41 57.02 11.34 2.49 1.44 0.93
90% Probability 473.78 83.91 15.52 3.10 1.71 1.02
80% Probability 834.13 136.39 22.97 4.07 2.10 1.15
75% Probability 1,046.98 165.68 26.84 4.53 2.28 1.21
50% Probability 4,367.94 537.00 66.13 8.14 3.52 1.52

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare