20 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 40% | 12 Months Subscription Plan

44,000.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_20_1760000_c_40

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 20 Equity and ETF Scripts {15 Equities and 5 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 40%
Portfolio Risk Future Risk may Exceed 45%
Minimum Annual Investment Capital ₹ 17,60,000
Optimal Investment Tenure 9 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 25%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 64 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 64.39 14.38 3.78 1.09 0.76 0.64
99% Probability 155.16 31.66 6.96 1.73 1.08 0.78
98% Probability 213.09 41.78 8.69 2.03 1.23 0.84
95% Probability 344.30 63.27 12.24 2.59 1.48 0.94
90% Probability 532.58 92.04 16.60 3.21 1.75 1.03
80% Probability 926.18 147.72 24.26 4.20 2.14 1.16
75% Probability 1,156.54 178.68 28.24 4.66 2.32 1.21
50% Probability 4,614.50 562.00 67.80 8.25 3.54 1.52

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare