20 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 40% | 12 Months Subscription Plan

33,250.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_20_1330000_c_40

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 20 Equity and ETF Scripts {15 Equities and 5 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 40%
Portfolio Risk Future Risk may Exceed 45%
Minimum Annual Investment Capital ₹ 13,30,000
Optimal Investment Tenure 9 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 32.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 32.54 8.12 2.24 0.77 0.57 0.53
99% Probability 98.83 21.10 4.91 1.33 0.88 0.68
98% Probability 146.92 29.68 6.49 1.63 1.02 0.75
95% Probability 267.89 49.75 9.85 2.19 1.29 0.86
90% Probability 460.47 79.36 14.35 2.85 1.58 0.96
80% Probability 911.20 142.58 23.02 3.95 2.03 1.11
75% Probability 1,200.67 180.38 27.81 4.50 2.24 1.18
50% Probability 7,407.62 798.84 86.06 9.28 3.81 1.56

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare