20 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 30% | 12 Months Subscription Plan

32,750.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_20_1310000_c_30

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 20 Equity and ETF Scripts {15 Equities and 5 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 30%
Portfolio Risk Future Risk may Exceed 50%
Minimum Annual Investment Capital ₹ 13,10,000
Optimal Investment Tenure 10 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 42.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 42.72 10.67 2.86 0.97 0.70 0.61
99% Probability 106.27 23.54 5.60 1.54 1.00 0.75
98% Probability 147.80 31.37 7.09 1.82 1.14 0.81
95% Probability 243.38 48.33 10.09 2.33 1.38 0.91
90% Probability 382.98 71.52 13.89 2.91 1.64 1.00
80% Probability 679.77 116.98 20.67 3.85 2.03 1.14
75% Probability 856.01 142.46 24.21 4.29 2.21 1.19
50% Probability 3,662.96 471.80 60.68 7.79 3.42 1.51

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare