15 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 10% | 12 Months Subscription Plan

31,250.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_15_1250000_c_10

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 15 Equity and ETF Scripts {14 Equities and 1 Commodity ETF}
ETFs Composition Percentage Commodity ETFs Composition is 10%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 12,50,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 40%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 42 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 42.05 10.19 2.72 0.87 0.63 0.57
99% Probability 118.00 24.71 5.59 1.47 0.95 0.72
98% Probability 170.68 33.95 7.25 1.77 1.09 0.78
95% Probability 297.59 54.93 10.70 2.33 1.35 0.88
90% Probability 493.70 84.81 15.21 2.98 1.64 0.99
80% Probability 932.13 146.32 23.64 4.05 2.07 1.13
75% Probability 1,204.57 182.17 28.18 4.57 2.27 1.19
50% Probability 6,338.67 711.24 79.62 8.93 3.72 1.55

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare