15 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 30% | 12 Months Subscription Plan

34,250.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_15_1370000_c_30

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 15 Equity and ETF Scripts {11 Equities and 4 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 30%
Portfolio Risk Future Risk may Exceed 50%
Minimum Annual Investment Capital ₹ 13,70,000
Optimal Investment Tenure 10 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 41 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 41.27 9.65 2.60 0.83 0.60 0.55
99% Probability 121.42 24.77 5.50 1.42 0.92 0.70
98% Probability 178.63 34.53 7.21 1.72 1.07 0.76
95% Probability 320.73 57.32 10.87 2.31 1.33 0.87
90% Probability 545.34 90.45 15.73 2.99 1.63 0.98
80% Probability 1,066.07 160.60 25.01 4.13 2.09 1.13
75% Probability 1,397.32 202.45 30.12 4.69 2.30 1.19
50% Probability 8,245.39 867.13 90.93 9.54 3.87 1.57

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare