15 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 20% | 12 Months Subscription Plan

25,500.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_15_1020000_c_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 15 Equity and ETF Scripts {12 Equities and 3 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 55%
Minimum Annual Investment Capital ₹ 10,20,000
Optimal Investment Tenure 11 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 46 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 46.21 10.75 2.78 0.88 0.63 0.56
99% Probability 134.14 26.96 5.86 1.49 0.95 0.71
98% Probability 196.40 37.39 7.65 1.80 1.10 0.78
95% Probability 348.18 61.20 11.43 2.39 1.37 0.88
90% Probability 584.93 95.61 16.42 3.08 1.66 0.99
80% Probability 1,126.84 167.92 25.84 4.22 2.12 1.14
75% Probability 1,468.74 210.55 30.97 4.78 2.33 1.20
50% Probability 8,277.25 867.87 90.83 9.54 3.87 1.57

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare