15 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 20% | 12 Months Subscription Plan

31,750.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_15_1270000_c_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 15 Equity and ETF Scripts {12 Equities and 3 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 55%
Minimum Annual Investment Capital ₹ 12,70,000
Optimal Investment Tenure 11 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 35%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 41 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 41.11 10.03 2.73 0.89 0.65 0.58
99% Probability 111.58 23.94 5.52 1.47 0.96 0.73
98% Probability 159.80 32.62 7.11 1.76 1.10 0.79
95% Probability 274.60 52.08 10.40 2.31 1.36 0.89
90% Probability 449.21 79.43 14.64 2.94 1.63 0.99
80% Probability 835.40 135.04 22.48 3.96 2.05 1.13
75% Probability 1,072.37 167.05 26.67 4.46 2.25 1.19
50% Probability 5,330.05 622.91 72.83 8.53 3.62 1.53

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare