10 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Equity ETFs Composition is 10% | 12 Months Subscription Plan

17,250.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_10_690000_e_10

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 10 Equity and ETF Scripts {9 Equities and 1 Equity ETF}
ETFs Composition Percentage Equity ETFs Composition is 10%
Portfolio Risk Future Risk may Exceed 65%
Minimum Annual Investment Capital ₹ 6,90,000
Optimal Investment Tenure 13 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 78 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 78.01 15.66 3.52 0.96 0.66 0.56
99% Probability 233.49 40.34 7.59 1.67 1.00 0.72
98% Probability 345.16 56.59 9.99 2.02 1.17 0.79
95% Probability 624.30 94.19 15.12 2.71 1.47 0.90
90% Probability 1,065.90 149.28 21.95 3.52 1.80 1.01
80% Probability 2,093.65 266.73 35.01 4.87 2.31 1.16
75% Probability 2,751.06 336.57 42.20 5.54 2.54 1.23
50% Probability 16,620.84 1,465.43 129.14 11.35 4.30 1.63

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare