25 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 20% | 12 Months Subscription Plan

42,375.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_25_1695000_c_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 25 Equity and ETF Scripts {20 Equities and 5 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 50%
Minimum Annual Investment Capital ₹ 16,95,000
Optimal Investment Tenure 10 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 32.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 32.92 8.44 2.40 0.82 0.61 0.56
99% Probability 91.16 20.39 4.94 1.38 0.91 0.71
98% Probability 131.83 28.05 6.39 1.66 1.05 0.77
95% Probability 230.61 45.30 9.43 2.18 1.30 0.87
90% Probability 380.97 69.86 13.40 2.79 1.58 0.98
80% Probability 718.17 120.43 20.78 3.80 1.99 1.12
75% Probability 927.94 149.92 24.75 4.28 2.19 1.18
50% Probability 4,895.46 585.41 69.84 8.35 3.57 1.53

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare