25 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 10% | 12 Months Subscription Plan

44,500.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_25_1780000_c_10

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 25 Equity and ETF Scripts {23 Equities and 2 Commodity ETFs}
ETFs Composition Percentage Commodity ETFs Composition is 10%
Portfolio Risk Future Risk may Exceed 50%
Minimum Annual Investment Capital ₹ 17,80,000
Optimal Investment Tenure 10 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 30%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 34.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 34.55 8.92 2.56 0.90 0.66 0.59
99% Probability 88.64 20.39 5.04 1.44 0.96 0.74
98% Probability 124.61 27.43 6.42 1.71 1.09 0.80
95% Probability 209.12 42.85 9.25 2.21 1.33 0.89
90% Probability 333.88 64.02 12.83 2.78 1.59 0.99
80% Probability 600.97 106.16 19.30 3.70 1.98 1.12
75% Probability 761.81 130.05 22.71 4.14 2.16 1.18
50% Probability 3,440.11 448.70 58.64 7.66 3.39 1.50

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare