15 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Commodity ETFs Composition is 10% | 12 Months Subscription Plan

26,875.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_15_1075000_c_10

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 15 Equity and ETF Scripts {14 Equities and 1 Commodity ETF}
ETFs Composition Percentage Commodity ETFs Composition is 10%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 10,75,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.2
Backtest – Annualised Returns Hist. Annualised Returns Under 45%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 40%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 41.5 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 41.99 9.86 2.63 0.86 0.62 0.56
99% Probability 116.91 24.44 5.50 1.45 0.93 0.71
98% Probability 170.64 33.77 7.16 1.75 1.08 0.77
95% Probability 301.25 55.10 10.68 2.31 1.34 0.88
90% Probability 503.85 85.78 15.28 2.97 1.63 0.98
80% Probability 963.10 149.63 23.93 4.06 2.07 1.13
75% Probability 1,250.36 187.10 28.63 4.60 2.28 1.19
50% Probability 6,874.37 754.82 82.90 9.11 3.76 1.56

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare