10 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | Equity ETFs Composition is 30% | 12 Months Subscription Plan

14,750.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_10_590000_e_30

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Scripts Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 10 Equity and ETF Scripts {7 Equities and 3 Equity ETFs}
ETFs Composition Percentage Equity ETFs Composition is 30%
Portfolio Risk Future Risk may Exceed 60%
Minimum Annual Investment Capital ₹ 5,90,000
Optimal Investment Tenure 12 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.3
Backtest – Annualised Returns Hist. Annualised Returns Under 50%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 25%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 35%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 8 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 83 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 83.58 17.16 3.87 1.07 0.72 0.59
99% Probability 230.28 41.10 7.90 1.77 1.07 0.75
98% Probability 330.20 56.15 10.19 2.11 1.23 0.82
95% Probability 570.52 89.83 14.95 2.77 1.51 0.92
90% Probability 935.25 137.21 21.09 3.53 1.82 1.03
80% Probability 1,739.37 233.86 32.46 4.76 2.29 1.17
75% Probability 2,234.55 289.83 38.53 5.36 2.51 1.23
50% Probability 11,165.81 1,085.17 105.59 10.27 4.05 1.59

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare