5 Equity and ETF Scripts Long Term Growth Portfolio | Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing) | Rebalancing Monthly | AllETFs Composition is 20% | 12 Months Subscription Plan

74,000.00 for 1 year

Telegram Bot Command for @ShubhaangBot : /infr_5_2960000_t_20

Click here: “Portfolio Research Report & Factsheet”.

Click here: “Instructions & Standard Disclosures”.

Portfolio Parameters

Parameter Value
Stock Group Title Theme – Infrastructure (Construction Materials – Construction – Financial Services – Utilities – Services – Industrial Manufacturing)
Portfolio Size 5 Equity and ETF Scripts {4 Equities and 1 All ETF}
ETFs Composition Percentage AllETFs Composition is 20%
Portfolio Risk Future Risk may Exceed 65%
Minimum Annual Investment Capital ₹ 29,60,000
Optimal Investment Tenure 13 or more years.
Rebalancing Frequency Rebalancing Monthly
Subscription Tenure 12 Months Subscription Plan
Backtest – Sharpe Ratio Hist. Sharpe Ratio above 1.6
Backtest – Annualised Returns Hist. Annualised Returns Under 65%
Backtest – Annualised Risk Hist. Annualised Risk Exceeding 30%
Backtest – Max. Drawdown Hist. Max. Drawdown Exceeding 40%
Backtest – Max. Recovery Time Hist. Max. Recovery Time Exceeding 7 Quarters
Simulation – Lumpsum Capital Growth Multiple ** More than 490 times in 20 yrs with 99.9% probability

Simulation Results :- Lumpsum Capital Growth Multiples over Future Years at varying Probability Levels

Probability Levels (%) 20 Years 15 Years 10 Years 5 Years 3 Years 1 Year
99.9% Probability ** 491.73 57.27 8.34 1.40 0.81 0.58
99% Probability 1,615.31 166.39 19.02 2.58 1.29 0.76
98% Probability 2,431.76 237.98 25.40 3.16 1.51 0.84
95% Probability 4,563.97 410.40 39.37 4.30 1.91 0.97
90% Probability 8,101.73 670.74 58.62 5.67 2.37 1.09
80% Probability 16,597.98 1,247.18 96.70 8.02 3.09 1.27
75% Probability 22,164.17 1,598.69 118.03 9.20 3.43 1.35
50% Probability 1,53,403.84 7,772.42 390.86 19.75 6.00 1.82

Refer to the “Backtests & Simulations” tab for further details on their operational settings.

Compare